The sheds, kitchens and stairs have been demolished and most of the old materials have been taken away over the last two days.   The opening has been made in the back wall of the shop.  The extension will come straight off the back of the building and will be about 11m in length.   The chimney has been retained, the fireplace on the first floor will be in the new living area.